3D BIM model with coordinated MEP systems
MEP Coordination · BIM Management · Construction-Ready

BIM coordination
that actually works on site.

Multi-disciplinary coordination for complex projects — parking garages, towers and dense MEP systems. A model that arrives on site construction-ready, not just presentation-ready.

BIM MODELING
CLASH DETECTION
COORDINATION
DELIVERABLES
Our Projects

Drag. See the work.

One side: a building with walls and façade. The other: the same building, systems exposed. This is the coordination behind the concrete.

Yehud towers — exposed MEP systems
Yehud towers — finished building
Finished Building Exposed Systems

Residential Towers — Yehud

Full MEP coordination for all floors · shared parking garage

Medical center — exposed MEP systems
Medical center — structural frame
Structural Frame Complex Systems

Medical Center

18,000 m² · MEP design · high density · sterile-environment requirements

In collaboration with A. Sadeh Projects
Haifa office building — systems network
Haifa office building — finished structure
Finished Structure Systems Network

Office Building — Haifa

Massive systems network · coordination across all floors

In collaboration with A. Sadeh Projects
Logistics center — exposed infrastructure
Logistics center — finished building
Logistics Building Exposed Infrastructure

40-Dunam Logistics Center — Caesarea

Refrigeration, electrical and fire-protection systems · external infrastructure coordination

In collaboration with A. Sadeh Projects

Drag left or right to compare · arrow keys work too

40+
Completed Projects
10+
Years of Experience
100%
Construction-Ready Models
The Problem

Why most coordination
fails during construction.

Clash reports that don't solve anything

A long list, with no real change to the model.

A model that doesn't translate to the field

Looks great on screen — then gets stuck with the contractor on site.

Clashes discovered only on site

Concrete demolition, design changes, delays.

Unnecessary costs and budget overruns

Every on-site clash = money that wasn't planned.

Most BIM models look good —
but fail at the construction stage.
The Solution

Coordination by construction logic — not just the model.

The approach here is managerial and execution-driven. The goal: a model the contractor can actually build from.

  • Preventing construction errors — before the field

    Finding and solving problems in the model, while they're still cheap.

  • Coordination by real construction logic

    Not just intersecting lines — sequences, maintenance and access.

  • Full clash control through closure

    Every issue is managed to "closed" status — fully documented.

  • Coordination management with all consultants

    I'm the single address. No "I passed it to the architect, done."

  • A model ready for work — not just for show

    What comes out of coordination gets built on site.

3D BIM model with MEP coordination
Services

Our Services.

Comprehensive BIM services for complex projects: hospitals, commercial and office buildings, residential neighborhoods and logistics centers.

Full BIM Coordination for Complex Projects

Hospitals, commercial and office buildings, residential neighborhoods and logistics centers. Architecture, structure and MEP — full management of the central model with all parties, through to a construction-ready model.

BIM model of a medical center — full MEP coordination

Point Cloud to BIM Model

Scan to BIM: 3D scanning of existing buildings and conversion of the point cloud into an accurate BIM model — for as-built documentation, renovations and building additions.

Underground Parking Coordination

The densest area of the project — drainage, fire protection, electrical and ventilation at minimal clear height. A model that passes clearance checks before the field.

Underground parking garage coordination, Yehud

Quantity Takeoffs & Progress Reports

Quantities per Israeli standards and model-based progress reports — ready for pricing and site tracking.

Quantity table and BIM model

VDC & Documentation

Weekly VDC meetings and organized documentation at every stage — with architects, consultants and subcontractors.

Site Logistics & Crane Plans

Construction site planning, crane positioning and access routes — before work begins.

Site logistics and crane planning
Process

Five steps.
One construction-ready output.

Model & drawing review

Clash & coordination issue detection

Issue creation & management

Coordination rounds with consultants

Delivery of a construction-ready model

Tamir Gauman — BIM and MEP coordination manager
Who's Behind the Coordination

Tamir Gauman

BIM and MEP coordination manager for complex projects of construction companies. Extensive experience leading residential, public and commercial projects — from early design to handover — including weekly VDC meetings with architects, MEP consultants and subcontractors.

My specialty is turning the BIM model from a theoretical file into a real management tool in the field: closing clashes before they become rework, producing construction drawings the crew understands without interpretation, and giving the project manager control over schedule and budget before construction begins.

Not just a model — a solution that works in construction.
Get Started

Send your drawings.
Get a fast estimate.

You'll get a price range and scope for your project, within 24 hours.

Please enter your full name
Please enter your company name
Please enter a valid email address
Please enter your phone number

We'll get back to you within 24 hours · t@gauman.co.il